Logo Base de Conhecimento

2.82.0 – Loading data from BIMachine structures

In order to improve the platform’s performance, we are going to change the loading policy for BIMachine structures.

Currently, these structures are updated automatically when they do not have a load schedule configured. This occurs through the link established when the structure is created, where it is defined which data structures will feed it.

As of October 23, 2024, this rule will change. In order for these structures to continue to be updated, a load schedule will have to be set up.

If your environment contains BIMachine structures without an active load schedule, we recommend that you set up a sequential schedule. This way, your structure will be updated after your linked data structures have been loaded. See how to create a sequential schedule here.

Important: if your BIMachine structure already has an active schedule, nothing will be changed, so no action is necessary.

If you have any questions, please contact us through our support channels, we’re ready to help!

Latest Articles

Scroll to Top
ada-icon Ada.ai